Case Study
Leeds General Infirmary

TASK

Leeds General Infirmarys Clarendon Wing was looking to upgrade the lighting installation

They needed a solution which would achieve the same light level whilst retain existing fittings using new LED gear trays

ORIGINAL INSTALLATION

The original installation featured a mixture of  2 x 49W T5 1500mm luminaires and 4 x 14W T5 Panels

TECHNICAL DATA

Original Installation

Luminaire type Circuit Power per Luminaire QTY installed Total Consumption
2×49 T5 98 104
4×14 T5 56W 66 127.2 kW per day

New Installation

Luminaire type Circuit Power per Luminaire QTY installed Total Consumption
1500mm Gear Tray 20W 104
Celestial Panel 27W 66 46.3 kW per day

COMPLETION DATE

All goods were supplied by the end of March 2020 against a delivery schedule supplied by the client.

PAYBACK PERIOD

The payback period was 1.3 Years

 

 

The Results

JOIN OUR MAILING LIST

Signup to our mailing list to receive company updates and product information straight to your inbox.


By submitting this form, you are consenting to receive marketing emails from: Powerlite Lighting Solutions, Alkincote Street, Keighley, BD21 5JT. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact